Azizi Developments Reaches 94% Construction Milestone At Azizi Grand
Azizi Developments, a leading private developer in the UAE, has recorded significant progress at its premium residential project, Azizi Grand, officially reaching 94% overall construction completion.
The project has achieved 100% completion across all core structural and internal build stages, including the main framework, blockwork, internal plastering, and tiling. Mechanical, electrical, and plumbing (MEP) infrastructure stands at 94%, supported by HVAC mechanical systems at 93%. External works have advanced to 67%, with dedicated swimming pool leisure facilities tracking at 64%, keeping the development firmly on schedule for its completion timeline.
With primary civil works completed, on-site operations are now focused on the testing and commissioning of MEP systems, external landscaping, and architectural quality audits.
Mr. Farhad Azizi, Group CEO of Azizi Group, said: “Maintaining rapid, disciplined momentum on site is central to our operational focus. What began as a blueprint is transforming into a striking reality within Dubai Sports City, an exceptional residential addition to a dynamic destination that we take immense pride in building.”
Azizi Grand features a curated mix of modern residential units paired with integrated lifestyle amenities, including dedicated swimming pools, a fully equipped gymnasium, children’s play areas, and landscaped outdoor spaces. Strategically located in Dubai Sports City, the development offers direct connectivity to major transit arteries, placing business hubs, retail destinations, and international airports within easy reach.
Azizi Developments’ Sales Gallery is located on the 13th floor of the Conrad Hotel, Sheikh Zayed Road, Dubai.